Top Grade Concrete, LLC

Agricultural · the Mitchell area

For the operation that needs a bin pad level before harvest, a feed bunk run that stands up to daily use, or a pad the length of a new shed. Farm work is on our services list in exactly those words.

A long concrete pad poured the full length of a new agricultural building
a pad poured the length of a new ag building

Bin pads, bunk lines, and aprons, poured on farmyards around the Mitchell area.

Twin round grain bin pads cured and ready on the farmyard
twin grain bin pads, cured and ready
A long concrete feed bunk run set on a fresh pad
a feed bunk run set on a fresh pad
A fresh apron and walk going down at the storage units by the grain elevatorProcess · pour in progress
a fresh apron and walk at the storage units

photo: Top Grade pour, from their own record

Grading, digging, and farm work, run by the same operators who prep our own pours. If the job is dirt first and concrete second, one call covers both halves.

for hire: grading · digging · farm work

Tell us the date the bins need to stand and we will work the calendar backward from it. Farm deadlines are real deadlines and we treat them that way.

The pad at the top of this page runs the full length of a new ag building. Bring the dimensions and we will bring the crew.

Grading and digging ride the for hire line with the skidloader and dump truck, so a site can be cut, shaped, and poured without a second contractor.

Grain bin pads and valley gutters are on our flat work list by name, and farm work is its own line in how we describe the company. If it is concrete on a farmyard, ask.

Bin pad, bunk line, apron, or the whole yard. Tell us the season it has to happen in and we will line it out.

Call 605-999-7877